Service

Kitchen Remodeling

Custom kitchens designed for the way you actually cook and gather.

Modern Austin kitchen remodel with white oak cabinets, marble waterfall island and brass fixtures

Licensed & Insured

General liability + workers' comp

Written Warranty

Workmanship warranty on every project

5.0★ Client Rating

47+ verified Austin homeowners

Design + Build

One accountable team, one schedule

Local Since 2014

Austin & Hill Country focused

Kitchen Remodeling | Austin TX | Brightline Remodeling

Your kitchen is the heart of the home — and the most demanding room to remodel. We plan every detail before demo day so the result feels effortless: custom cabinetry, quiet appliance integration, durable stone, and lighting that flatters every meal.

A great Austin kitchen remodel starts months before the first cabinet is delivered. Brightline runs a structured discovery process to understand how you actually cook, host, store groceries, manage trash and recycling, and live in the space day to day. We measure existing conditions precisely, identify load-bearing walls and mechanical constraints, and model 2–3 layout options in 3D so you can walk through each one before approving a direction. The result is a remodel that solves the actual problems with your current kitchen — not a generic Pinterest layout grafted onto an unfamiliar house.

Construction starts with controlled demolition behind zip-wall dust barriers. Existing plumbing, electrical and gas runs are evaluated and modernized to current code; we never re-use a connection that we wouldn't install fresh. New cabinetry is field-verified against framed openings before delivery, set with shimmed level reference lines, and scribed to walls so reveals stay consistent. Quartz, quartzite and marble countertops are templated digitally, fabricated locally, and dry-fit before final adhesion. Tile backsplashes, under-cabinet lighting, range hood venting and appliance integrations are coordinated by a single project manager so install sequence never blocks itself. Every wire, valve and fitting is photographed before drywall closes — your warranty file includes the as-built record.

Most Austin kitchen remodels run between $75K and $250K depending on cabinetry, stone, appliance package and structural scope. We are transparent about pricing during discovery and produce a fixed-scope line-item proposal before contract — no allowances buried in fine print, no surprise change orders mid-project. You'll have one project manager from sign-off through warranty walk, weekly photo updates, and a clean job site every single afternoon. That operational discipline is why our clients in West Lake Hills, Rollingwood and Northwest Hills consistently mention dust control and communication in their reviews.

If you're planning a kitchen remodel in Austin, Round Rock, Cedar Park, Leander or Georgetown, we'd love to learn about your project. Request a consultation below and a project manager will reach out within one business day to schedule an in-home discovery visit.

What's included

  • Demolition & disposal
  • Plumbing & electrical updates to code
  • Cabinetry installation
  • Countertop fabrication & install
  • Tile, paint, and trim
  • Final cleaning

Highlights

  • Custom and semi-custom cabinetry
  • Quartz, marble, and quartzite countertops
  • Layout reconfigurations & wall removals
  • Premium plumbing, lighting & appliance integration
  • Tile backsplashes & under-cabinet lighting
  • Range hood venting through roof or sidewall

Our process

  1. Step 1

    Discovery

    We learn how you cook, host, and store — and design around that.

  2. Step 2

    Design & Selections

    3D layouts, material samples, and a fixed scope before we start.

  3. Step 3

    Build

    Daily site cleanliness, weekly client updates, photographed progress.

  4. Step 4

    Final Walk

    Punch list closed, warranty in writing, and a kitchen that lasts.

Project gallery

Modern Austin kitchen remodel with marble waterfall island
Custom white oak kitchen cabinetry with brass hardware
Calacatta marble countertop with brass faucet detail
Large-format porcelain tile work in a luxury kitchen

Have questions before reaching out? Check our FAQ, see what our clients say, browse the gallery, or contact our team.

Client Reviews

What clients say about our kitchen remodeling projects.

"Brightline ran the cleanest job site we've ever seen. The schedule slipped by exactly one day across a 14-week project — and they told us about it a week in advance."
Sarah & Mark T. · West Lake Hills
"We interviewed five contractors. Brightline was the only one who walked us through risks before we signed. That honesty paid off all year."
Jennifer R. · Allandale

FAQ

Kitchen Remodeling questions

Most kitchen remodels run 8–12 weeks once permits are in hand. Layout changes, structural work or custom cabinet lead times can extend that to 14–16 weeks. We lock the schedule before demo day and update you weekly.
CallRequest Quote